3 Comments

timing is everything

I started a vest for myself.  I shouldn’t have, but I did.

At guild on Tuesday I won a mini raffle we did, and got a 2012/2013 Bergere de France magazine.  There are some GORGEOUS patterns in there, but I was taken by 2 in particular.  One of them I’m not sure what yarn to use, but the other…well…it’s a fun fur vest.  I know.

I know.

I KNOW.

But it’s really cute, and worse comes to worst I’m always cold at home so….  Yeah.  Moving on…

The body is worked on 8mm needles so it’s a fast knit.  It’s kinda a shrug/vest hybrid, and on Wednesday night I cast on.  I finished the back ribbing and the first few rows of the body.  And then I brought it to work with me on Thursday so I could photocopy the pattern out of the magazine to make it easier to work on.

Now, I shouldn’t have started this project on Wed.  I had realized just that morning that Christmas might be in 2 weeks, but the last day of daycare/kindergarten is next week, which means I’m running out of time to do the holiday teachers’ gifts which I haven’t started yet.  I *should* have started those.  But I didn’t.

Which makes it only fitting that I forgot the project at work last night, and then today both boys woke up with fevers, meaning I had to keep them home, and be home all day, and NOT be able to work on the vest.

Which means that in about 5 minutes I’ll be starting the holiday teachers’ gifts, all due next week.  🙂


3 Comments

back to the doctor with henri we go

I kept Henri home from school again today…his fever isn’t as high but the poor kid can’t stop coughing his lungs out, and I wanted to make sure it wasn’t more than just a virus.  Turns out it’s now developed into bronchitis and an ear infection.  😦

Because we were home for the day I got quite a bit of knitting done and am still running ahead of where I should be (11 rows ahead of schedule), though I look forwards to getting more done when we’re home tomorrow (since I need to keep him home until he’s on antibiotics at least 24 hours).

Here’s a pic of me that my cousin Amy took last night at guild.  We show off our recent finished objects then Amy takes pics for our guild photo album.

Photo credit to Photography by Amy Grauer


2 Comments

that yarn from the other day

My arms are in great shape after a week of winding.

I turned Veronik‘s 2 cones of St. Denis Nordique, last seen looking like this:

Into this:

That’s 2 swatches, and 40 mini cakes, ready for our November MKG meeting.  I copied the gauge for a sample pattern using this yarn (Agathe, from the Spring/Summer 2010 issue of the St. Denis magazine), and knit 2 swatches using the required yarn and needles (with a moss stitch border). Our guild project will be to have everyone knit up the same swatches, and then to compare and see what a (presumably) vast array of actual swatch sizes we end up with, as a means to illustrating the importance of swatching.  You know, that just because you use the yarn and needles called for in the pattern, doesn’t mean you’ll end up with anything near the pattern’s gauge.

Each guild member who attends will get a little cake of yarn and a copy of instructions that I printed earlier.  It took me roughly 100 feet of yarn for my swatches, so I wound each cake to 120 feet to account for looser tensions eating more yarn.  (My yarn meter works in feet, and I’m too lazy to do the math right now.  Divide by 3 for yards).

My swatches will be used as examples by Veronik, who is bringing along her trusty steamer to show what a difference blocking makes.  One swatch will be steamed and become the “after”, while the other will remain as-is, as the “before”, and silently simmer and fume.

I also wound up the yarn that Maaike wound for me so I can finish my Linden.  I set up her ginormous wooden cake winder (because it winds ginormous cakes, not that it takes up a large desk footprint) and wound up (heh) with 2 BABs.

Yes, Maaike and I often speak in Three Letter Acronyms.  These babies?  They’re some Big A$$ Balls.